Main mast lifted on the quay for inspection and maintenance

Uppdaterad: jun 22

On Friday the 8th of May a unique happening was taking place! Two huge cranes came to the quay and lifted the main mast. It was shifted to the quay to be thoroughly inspected. This inspection is necessary to prepare the ship for a possible China expedition next year.


See below a link to the time laps we made from this operation.



  • Instagram - Vit Circle
  • YouTube - Vit Circle
  • Facebook - Vit Circle
  • Twitter - Vit Circle

Copyright © SOIC Ship Management AB

 

PRIVACY POLICY